Home 
 Documents 
 News 
 Calendar 
 Project Overview 
 Site Background 
 Site Status 
 Contact Information 
 Web Links 

back to Site Photos



Pre-2006 Photographs

Scroll down to see photos of:

  • Wetlands Staging For Excavation
  • Wetland Excavation and Verification Sampling
  • Wetland Restoration
  • Northern Area Vertical Profiling
  • ISCO Injection Activities

    Wetland Staging For Excavation

    Creating temporary roadways[October 2003].


    Preparing soil stockpile area and gross decontamination station[October 2003].

    Wetland Excavation and Verification Sampling

    Excavation activities in Area C [October 2003].


    Excavation activities [November 2003].


    Verification sampling [November 2003].


    Verification sampling [December 2003].


    Winter excavation [January 2003].


    Verification sampling [January 2004].

    Wetland Restoration

    Resoiling wetlands to prepare for planting [February 2004].


    Resoiling wetlands and planting [February 2004].


    Closeup of planting bulbs using coconut mesh for stabilization [February 2004].


    Spring flooding of wetlands with saplings emerging from the water [May 2004].


    Flooded wetlands with sapling growing upland [May 2004].


    Restoration of outfall and additional planting upland [June 2004].


    Returning wildlife - painted turtle (Chrysemys picta) [July 2004].


    Returning wildlife - Killdeer plover (Charadrius vociferus) [July 2004].


    Returning wildlife - Northern Leopard frog (Rana pipiens) [July 2004].

    Northern Area Vertical Profiling

    Geoprobe setup with sediment barrier made of filter material and staked straw bales [January 2003].


    Another Geoprobe setup with sediment barrier and plastic berm [January 2003].


    ATV drilling rig setup [January 2003].
    ISCO Injection Activities

    Tanker truck delivering the permanganate [May 2004].


    Holding tanks and distribution manifold inside spill guard [May 2004].


    Indoor injection setup with injection tubing leading from secondary distribution manifold to injection points [May 2004].


    Outdoor injection setup with injection tubing leading from distribution manifold to injection points [June 2004].


    Geoprobe setup for pressure injection [June 2004].


    Close up of pressure injection setup [June 2004].


    Wellhead setup for pressure-pulse injection [June 2004].


  • Home : Documents : News : Calendar



    Copyright © 2002 ERM Group, Inc., All rights reserved.
    For questions and comments about the site, please contact the webmaster.