Home
Documents
News
Calendar
Project Overview
Site Background
Site Status
Contact Information
Web Links
back to Site Photos
Pre-2006 Photographs
Scroll down to see photos of:
Wetlands Staging For Excavation
Wetland Excavation and Verification Sampling
Wetland Restoration
Northern Area Vertical Profiling
ISCO Injection Activities
Wetland Staging For Excavation
Creating temporary roadways[October 2003].
Preparing soil stockpile area and gross decontamination station[October 2003].
Wetland Excavation and Verification Sampling
Excavation activities in Area C [October 2003].
Excavation activities [November 2003].
Verification sampling [November 2003].
Verification sampling [December 2003].
Winter excavation [January 2003].
Verification sampling [January 2004].
Wetland Restoration
Resoiling wetlands to prepare for planting [February 2004].
Resoiling wetlands and planting [February 2004].
Closeup of planting bulbs using coconut mesh for stabilization [February 2004].
Spring flooding of wetlands with saplings emerging from the water [May 2004].
Flooded wetlands with sapling growing upland [May 2004].
Restoration of outfall and additional planting upland [June 2004].
Returning wildlife - painted turtle (Chrysemys picta) [July 2004].
Returning wildlife - Killdeer plover (Charadrius vociferus) [July 2004].
Returning wildlife - Northern Leopard frog (Rana pipiens) [July 2004].
Northern Area Vertical Profiling
Geoprobe setup with sediment barrier made of filter material and staked straw bales [January 2003].
Another Geoprobe setup with sediment barrier and plastic berm [January 2003].
ATV drilling rig setup [January 2003].
ISCO Injection Activities
Tanker truck delivering the permanganate [May 2004].
Holding tanks and distribution manifold inside spill guard [May 2004].
Indoor injection setup with injection tubing leading from secondary distribution manifold to injection points [May 2004].
Outdoor injection setup with injection tubing leading from distribution manifold to injection points [June 2004].
Geoprobe setup for pressure injection [June 2004].
Close up of pressure injection setup [June 2004].
Wellhead setup for pressure-pulse injection [June 2004].
Home
:
Documents
:
News
:
Calendar
Copyright © 2002 ERM Group, Inc., All rights reserved.
For questions and comments about the site, please contact the
webmaster
.