Home 
 Documents 
 News 
 Calendar 
General Files

Remedy Operation Status (310 CMR 40.0870)

Remedy Operation Status (310 CMR 40.0870)

The Remedy Operation Status applies to disposal sites where a remedial system which relies upon Active Operation and Maintenance is being operated for the purpose of achieving a Permanent Solution pursuant to Phase V- Operation, Maintenance, and/Monitoring (310 CMR 40.0890). The standards to achieve and maintain a Remedy Operation Status for a disposal site are the following:

  • the remedial system needs to be adequately designed to achieve a Permanent Solution;
  • the remedial system needs to be properly operated and maintained;
  • any oil or hazardous material must be eliminated or controlled;
  • any substantial hazard must be eliminated; and
  • monitoring data pertaining to operation and maintenance or monitoring must be submitted at least every six months

    01.RTN 3-13302 / 11.Remedy Operation Status

     Name  Size (MB)  Modified
     02.Status Reports  9/23/2023 10:15:39 PM 
     03. NOI (Bio System Expansion) March 2011  9/23/2023 10:15:50 PM 
     01.Remedy Operation Status Transmittal Form BWSC108 3-Dec-04.pdf 0.712/14/2004 7:46:18 PM 
     Thumbs.db 011/28/2012 7:27:51 PM 

     Parent Folder 

    Adobe Acrobat is required to read most files.



  • Home : Documents : News : Calendar



    Copyright © 2002 ERM Group, Inc., All rights reserved.
    For questions and comments about the site, please contact the webmaster.